Global Electrical were chosen to modify existing pipework to allow a Trane rental chiller to be installed on site with stand alone power generator and fuel bowser to allow for the existing 20 year old chiller to be removed and space made available for more laboratory plant
The New rental chiller was connected and up and running within 40 minutes of delivery and managed the existing chilled water load. The existing power was adapted for use of the new Lab plant for future use.