Global Electrical were contracted to carry out the delivery and Installation of a New Trane Air cooled chiller at a NHS Call center in Dudley, West Midlands.
Global Electrical, carried out the decommissioning of the redundant MQuay Chiller and wrote the lift Plans for the equipment to be removed off site under waste licence and the new Trane chiller to be installed.
A Trane Air cooled chiller was installed on new concrete Plinths all pipework was cut back and insulation removed.
Pipework was modified and fabricated to line up with new chiller configuration and connected back onto the primary Chilled water circuit.
The chiller wiring was adjusted to suit new location of switch gear and Trend controls were reconnected