Global Electrical have been chosen as the preferred contractor to supply and install 2 Dry air coolers for the site after the existing units split during the winter.
Global Electrical liased with the client to design the new units required to replace the unserviceable ones on site.
Global Electrical worked with the site Trend controls contractor and rewired the Dry Air Cooler site system on to the site BMS.
Existing Units and temporary air cooler on site to allow chiller heat rejection.